Appropriate structural checks of the entire building were carried out to assess the feasibility of installing the crane. Thanks to this decision, it was possible to renovate the residential unit located on the top floor.
The steel profile structure designed to support the crane’s loads was engineered in such a way that it could be reused for the subsequent construction of a residential unit in steel and glass, connected to the lower floor of the house through a reinforced concrete staircase.